Management Software: Submittals Feature for Electrical Projects
Electrical submittals are rarely simple. A single commercial project can include dozens of line items across multiple manufacturers, each requiring spec sheets, cut sheets, and structured documentation organized by phase.
In many agencies, submittal packages are assembled manually — downloading PDFs, renaming files, merging documents, rebuilding cover sheets, and reformatting bill of materials every time a revision is requested. When one product changes or goes on backorder, the entire package may need to be reconstructed.
Electrical Submittal Software from Multimicro Systems transforms this process into a structured, repeatable workflow. Bill of materials, phase segmentation, manufacturer documentation, and project metadata are automatically organized under each line item — producing professional, engineer-ready submittal packages in minutes instead of hours.
Electrical Submittal Software for Sales Agencies and Distributors
Electrical submittals are documentation-intensive. A single commercial project may include dozens of line items across multiple manufacturers, each requiring structured specification sheets, cut sheets, and project references.
In many organizations, submittal packages continue to be prepared through manual processes. Files are downloaded individually, renamed, merged, formatted, and reorganized for every revision. When a catalog number changes or a product goes on backorder, documentation must be rebuilt. This consumes administrative time and introduces avoidable errors.
Multimicro Systems provides structured electrical submittal software that connects project records, bill of materials, and manufacturer documentation into a repeatable workflow.
What It Replaces
Electrical Submittal Software reduces dependence on:
- Manual PDF merging and formatting
- Independent bill of materials spreadsheets
- Disconnected shared drives
- Repetitive file renaming and organization
- Email-based documentation tracking
Centralizing documentation within project records improves internal consistency.

Maintaining Documentation Within Projects
Submittal documentation remains associated with:
- Specific projects
- Defined line items
- Manufacturer catalog numbers
- Project phases
When revisions occur, documentation can be updated within the project structure rather than reconstructed from scratch.
This supports consistency and organized recordkeeping across active and completed projects.
Structured Submittal Organization
Submittals are built from structured project data, including:
- Bill of materials
- Line item references
- Manufacturer information
- Project identification
- Phase grouping
Documentation is organized within the context of active project records rather than assembled from disconnected files.
Submittal packages are generated with:
This creates professional, engineer-ready output without repetitive formatting.
- Project metadata
- Line item organization
- Phase segmentation
- Embedded manufacturer specification sheets
- Clear navigation between bill of materials and product documentation
Version Control and Revisions
When products are updated, replaced, or revised:
- Documentation updates reflect project records
- Revisions remain organized
- Historical context is preserved
The result is faster turnaround, fewer errors, and consistent presentation across projects.
How It Fits Into Your Workflow
Feature headline
Line items and product selections are confirmed within the project.
Bill of Materials Organization
This temporary text is utilized solely for demonstration purposes, serving as a stand-in until authentic and finalized content becomes available.
Submittal Generation
This temporary text is utilized solely for demonstration purposes, serving as a stand-in until authentic and finalized content becomes available.
Feature headline
This temporary text is utilized solely for demonstration purposes, serving as a stand-in until authentic and finalized content becomes available.
Ongoing Project Reference
This temporary text is utilized solely for demonstration purposes, serving as a stand-in until authentic and finalized content becomes available.
High-end PDF Editor
You can markup the spec sheets professionally with our high-end PDF editor inlcuded with the software
Review the Submittal Workflow
The result is faster turnaround, fewer errors, and consistent presentation across projects.
To understand how structured bill of materials, phase organization, and manufacturer documentation can be assembled within a centralized system, schedule a submittal workflow review. A demonstration will walk through how submittal packages are organized, maintained, and updated within real project records.
Schedule a Submittal Demonstration
Frequently Asked Questions
How are manufacturer specification sheets included in submittals?
Manufacturer documentation can be associated with line items within project records and organized as part of the submittal package.
Can submittals be organized by project phase?
Project records can reflect phase-based grouping of line items and documentation.
How are revisions handled?
Documentation updates are maintained within the project record, supporting structured revision management.
Is submittal information connected to other workflow areas?
Submittal documentation exists within the broader management environment alongside quoting and project data.
Does the system replace document editing software?
The software organizes and maintains project documentation within structured records. It does not replace general-purpose document editing tools.
